Permitting and Compliance Done Right

Facing a TCEQ inspection, a Notice of Violation, or a permit deadline you didn't see coming? PES takes stormwater permitting, SWPPP, inspections, and reporting off your plate — fast. Call us at: 713-965-4125

Stormwater rules aren't optional — but they don't have to be your problem

One partner, from permit applicability to year-round reporting.

Where sites get exposed

Under the Clean Water Act and the Texas Pollutant Discharge Elimination System (TPDES), stormwater discharges are regulated for industrial facilities and any construction site that disturbs one acre or more.

Operate without valid coverage — or miss an inspection or monitoring report — and TCEQ enforcement follows: Notices of Violation, stop-work orders, and per-day penalties that compound fast.

How PES makes it disappear

We own the entire program. We confirm — in writing — what permit you need, build a defensible SWPPP, stand up your BMPs, run inspections on schedule, and file every NetDMR and Discharge Monitoring Report on time.

You get one point of contact, audit-ready records, and compliance you can prove.

Get a Quote

Why Facilities and Builders Choose PES

air emissions testing icon

Boots on the ground

Qualified inspectors on your site — not a checklist emailed from an office.

reliability gurantee

One point of contact

A single specialist who owns your program end to end.

esa interviews

We talk to TCEQ

We handle the agency conversations and the paperwork, so you don't have to.

air emissions control icon

Audit-ready, always

Documentation organized and defensible the day an inspector shows up.

Stormwater questions, answered

01Do I actually need a stormwater permit?

If you disturb one or more acres of land, or you operate a facility in a regulated industrial sector, you almost certainly need coverage under a TCEQ general permit. Our free assessment confirms it in minutes.

02Construction or industrial — which permit applies?

Construction sites disturbing one acre or more are typically covered by the Construction General Permit (TXR150000). Operating industrial facilities in regulated sectors fall under the Multi-Sector General Permit (TXR050000). We determine which applies to you in writing.

03I just got a Notice of Violation — can you help now?

Yes. We run a root-cause analysis, negotiate with the agency on your behalf, and build a defensible Corrective Action Plan to resolve the citation and limit penalties.

04How fast can you get me compliant?

Most sites move from assessment to an active, permit-ready SWPPP within about two weeks. Urgent renewals and NOV responses can be expedited — tell us your deadline.

05What does it cost?

Pricing is scoped to your site and the services you need. The assessment is free, and we'll give you a clear, fixed scope before any work begins — no surprises.